Sorry, you need to enable JavaScript to visit this website.
Case

School De Bever

Date

Voorlopige oplevering: 24/04/2024

Architect

Collectief Noord Architecten BVBA

Budget

Totale bouwkost: €4.890.000 - Aandeel technieken: €1.150.000 - Aandeel stabiliteit: €830.000

Client

AG Vespa

Sectors

Onderwijs

Size

1500 m²

BUILDING SERVICES:               

  • HVAC: heating, ventilation
  • Electricity: high and low voltage, lighting, data, fire protection, theatre technology
  • Sanitary: supply and drain pipes, external sewerage, rainwater recovery, appliances
  • Elevator 

STRUCTURAL

  • Pilefoundations 
  • Supporting floors consisting of lattice girderslabs and prestressed hollow core slabs
  • Load-bearing structure of mainly concrete brick masonry
  • Structure of concrete beams, walls and columns
  • Part of the pre-castings, near the middle section, wears down on steel girders and steel columns
  • The canopies consist of steel girders with wooden grating